Bridge Co. LTE.
Transport and logistics
Engineering Expertise
2008 - 2014
Full project details

The scope of works included providing track work for the conveyor system, three conveyors, a crushing station, a skyline tripper, a stockpile pad, a reclaim tunnel and a rail load-out bin.

Laing O’Rourke self-performed the design and construction of all components, which involved bulk earthworks, rail system construction and integration, signalling and communication, culverts and drainage, remediation works and the installation of coal-handling plant.

Design and engineering
An iconic building
Logistics and DfMA
Delivery and maintenance
An iconic building

The project drew on multidisciplinary strengths across Laing O’Rourke’s rail and infrastructure business units.

At its peak, the project employed more than 300 people from Laing O’Rourke, Centennial Coal and partner companies across the design, construction, operations and maintenance phases.

Logistics and DfMA

Through close liaison with the Australian Rail Track Corporation (ARTC), Laing O’Rourke negotiated a target incentive mechanism, mitigated interface risks and reduced program inefficiencies.

By providing integrated design and construction services, and preparing concept and preliminary designs and budgets as early as possible, Laing O’Rourke completed the project four months ahead of schedule.

theflixertvfree watch movies onlinezoroxfree new movies onlinecinezonewatch free animeflixhivefree online moviesanixwatch movies online freezoroxwatch free animeflixerflixhivefree movie onlinewatch movieswatch movies free onlineanitakufree movies online sitetheflixertvfree watch movies onlinethe flixerfree new movies onlinesflixwatch movies & tv shows onlineflixerfree new movies onlinetheflixertvlookmoviewatch free movies onlineflixerwatch free movies online freezoroxfree anime onlineflixhivemovies to watchanitakuwatch movies & tv shows onlineanitakuzorotoflixertv shows to watchsflix tvwatch series online